Vesgantti Velvet Chaise Lounge,59" Modern Upholstered Lounge Chair Indoor with Round Armrest Lumbar Pillow, Single Sofa for Living Room Bedroom Office,Grey
Shipping Information
✓ Free shipping within the United States
✓ Processing time: 1–3 business days
✓ Transit time: 3–5 business days
✓ Estimated delivery: 4–8 business days
Return & Refund
✓ 30-day returns from the date of delivery
✓ Items must be unworn, unused, and in original condition. Damaged, defective, or incorrect items will also be eligible for return.
✓ Refunds are issued to the original payment method after the return is received and approved
For complete details, please review our Shipping Policy and Return & Refund Policy.
⛪Vesgantti 59" Modern Velvet Chaise Lounge Indoor,Upholstered Lounge Chair with Left Armrest & Lumbar Pillow, Button Tufted Lounge Sofa for Living Room Bedroom Office,Tool-Free Assembly
⛪The latest addition to the Vesgantti, this Modern Velvet Chaise Lounge is uniquely and artistically designed, and is more like a beautiful decorative piece to adorn places such as living rooms, bedrooms and lounge areas.
-
👍Velvet Button-tufted Upholstered Lounge Sofa:Made of skin-friendly breathable velvet, this modern chaise longue is easy to maintain.
- 👍Spacious & Thick Cushion:Cushion Size: 52.36L * 9.45H * 24.41W inches. With wide and thick upholstered seat.
- 👍Lumbar Pillow with Zipper:Perfectly support your waist when you lean on the lounge sofa.
- 👍Rubber Wood Legs with Nonskid Pads:Complete with tipped golden rubber wood legs and nonskid pads, great stability, durability and beauty.
Seat Height:17.72 Inches
Seat Depth:24.41 inches
Seat Length:52.36 Inches
Item Weight:55.8 pounds
Product Dimensions:59.06"D x 26.57"W x 28.74"H
Color:Green,Blue,Grey,Orange
Back Style:Curved Back
Product Care: Wipe Clean
Maximum Weight Recommendation:400 Pounds
Style:Modern
Pattern:Solid
Finish Type:Velvet
Shape:L-Shape
Arm Style:Rolled
Form Factor:Upholstered
Fill Material:Sponge
Leg Style:Rubber Wood with Golden Tipped
Included Components Legs, Armrest, Backrest, Cushion, Lumbar Pillow
Room Type Office, Living Room, Bedroom, Leisure Area, Study Room
Special Feature:Adjustable Nonskid Pads, Lumbar Pillow,Tool Free Assembly
Q:Is it easy to assemble the item?
A:Yes, it's super easy, toal-free assembly! All you need is just to install the legs, armrest and backrest. After you get the chaise lounge, please flip over the cushion and unzip it, you will see the accessories are inside the seat compartment.
Q:What kind of fabric is used for this chaise lounge?
A:It is a kind of 100% velvet fabric which is more comfortable, softer and more skin-friendly.